Commercial Make Good & Site Regeneration. Welshpool
Complete industrial make-good and site regeneration to prepare the facility for its next phase of operation.

Scope of works included:
• Decommissioning and removal of redundant industrial equipment.
• Oxy-cutting and dismantling of heavy steel structures.
• Recovery and recycling of ferrous and non-ferrous metals.
• Removal of general waste and industrial debris.
• Detailed warehouse clean and floor preparation.
• Final handover with a clean, safe, and functional workspace.
Outcome:
The site was transformed from a heavily occupied production area into a clean, open industrial facility ready for sale, lease, refurbishment, or recommissioning. By recovering recyclable materials wherever possible, disposal costs were reduced while maximising value for the client. The project was completed safely, on time, and within budget.